Facebook Twitter LinkedIn
SEARCH

K&G Power Systems Home About K&G Products Parts Services Finance & Leasing Rentals Contact Us Store

SERVICES Home > Services > Featured Project Information

•   Air Compressor Service New York
•   Electric Motor Service New York
•   Pump Repair New York
•   HVAC Maintenance and Service
•   Process Blower and Vacuum Pump Service New York
•   Energy Audits
•   Portable Diesel Air Compressor Repair NY
•   Exhaust Fan and Ventilator Fan Repair NYC
•   Flood Damaged Motors and Controls NY
•   Generator Sales & Service NY
•   Variable Frequency Drive Service NY




KG PRODUCTS

Compressed Air Power Systems
Nitrogen Systems
Electro Mechanical Power Systems
Air Movement Systems
Portable & Stationary Power Systems
Pumps & Pumping Systems
Blowers & Vacuum Pumps






Troubleshoot motor and system with portable test equipment Rewind of 250HP Two Speed Blower Motor Remove, Reinstall, and Retrofit


250 HP Fan Repair and Motor Rewind

In the summer of 2007, we were contacted by a New York Power Plant to troubleshoot an ongoing issue with (2) 250HP two speed blowers.  These blowers cooled a main exhaust tunnel in New York City.  The situation was critical because excessive heat would cause Black Outs.   When the blowers operated at  low speed, they ran fine.   At high speed, however, the motors made a loud wining sound and created excessive vibration throughout the building. 

We began the process of diagnostic testing and gathered data to determine the root cause.  Our technicians performed a field hi pot test and discovered an issue with the motor windings.  When the fan was running at high speed it drew excessive amperage.   We discovered that the adjustable inlet guide vanes on the blowers were rusted in a full open position causing motor overload and excessive amperage draw.  

K&G Power Systems removed the first motor, rewound it in our shop, reinstalled it, laser aligned the two pulleys, changed all belts, unfroze the guide vanes and repositioned the vanes within spec of the motor nameplate amperage.  We also installed a lubrication system that would prevent the inlet vanes from freezing, and fabricated custom adjustment levers with locks.  After the first blower was completely overhauled, new york power plant requested that we repair the second blower to restore it to original factory specs.     

The New York Power Plant was extremely pleased with our work and stated that the fans never ran as well as they do now. 

Please contact JR Gandolfo, for more information about this job: Ph. 631-342-1171 or JR@kgpowersystems.com 